Read a Cron Expression's Day Fields in Its Next Runs
Preview concrete fire dates to see that a restricted day of month and weekday both schedule runs.

When both day fields are restricted, a cron schedule runs on either matching day. The Cron Expression Parser makes that easy to spot by listing its next ten local execution times.
A schedule that looks narrower than it is
Enter:
30 4 1,15 * 5
Try this in Cron Expression Parser
The tool describes it as “At 04:30 AM, on day 1 and 15 of the month, and on Friday.” Its next-run list, checked on 23 September 2026 in the browser, began with Friday 25 September at 04:30, Thursday 1 October at 04:30, then Friday 2 October at 04:30. Thursday 1 October is the giveaway. The job does not wait for the first or fifteenth to land on a Friday.
The field breakdown makes the mechanics visible: minute 30, hour 4, day of month 1,15, month *, and day of week 5. The preview starts from the day you open it, so its first dates will change. Before copying the expression to CI, compare three or four generated dates with the intended business schedule. Do the dates include an unexpected weekday? Are there extra runs around the first of a month?
What the preview can and cannot settle
The implementation accepts five-field cron and some six- or seven-field forms, including seconds-first expressions. That means field count matters. Its run list is calculated in the browser's local time zone and scans up to eight years for ten occurrences. A rare schedule can end with fewer than ten dates because the lookahead ran out; that does not mean the expression will never run again.
The preview answers “what does this page calculate from here?” It does not prove how GitHub Actions, Jenkins, Kubernetes, or another scheduler will handle time zones, daylight-saving transitions, missed runs, or dialect extensions. The broad cron boundary guide covers those deployment questions. For an operational schedule, test the expression with the scheduler and time-zone settings you actually deploy.
A review habit that takes one minute
Paste the expression, read the description, and write down the first three preview dates. Compare them with a sentence such as “run on the first and fifteenth, but only when they are Fridays.” If the dates disagree, change the design rather than trying to infer intent from five fields. For a weekday-only run, leave day of month unrestricted. For a true intersection, put the Friday condition inside the job or use a scheduler with a calendar rule that expresses both conditions.